There's a lot of discussions on the differences between performance measure and performance metric. So I am slightly confused.
I am using the expected PVP/Revenue>10% for the performance metric (which is the mean provided in the Results tab, cell I3).
I have always thought about just using PVP/Revenue>10%, or PVP/Revenue>10% with 90% probability (provided in cell H11).
Any Thoughts?
Thank you!
I am using the expected PVP/Revenue>10% for the performance metric (which is the mean provided in the Results tab, cell I3).
I have always thought about just using PVP/Revenue>10%, or PVP/Revenue>10% with 90% probability (provided in cell H11).
Any Thoughts?
Thank you!
BBA Task 2 Performance Metric